Client desired to run electrical wiring for a new sign without ruining the existing parking lot pavement or going all the way around the perimeter.
The objective was to utilize the Vermeer boring machine to run a direct run to the place on the building where the electrical exits the building.
In four hours A&P Directional Drilling was able to successfully run a one inch conduit underneath the pavement without any pavement buckling and lined up correctly with the target.